Install Training Field Days

When:
September 19, 2019 – September 20, 2019 all-day
2019-09-19T00:00:00-07:00
2019-09-21T00:00:00-07:00
Where:
Salt Spring Island, BC
Cost:
$500-$600
Contact:
Lesley Desjardins
855-872-2645

Learn more about the design and installation of a pressure distributed system, review the results from a site and soils evaluation along with the plan for a trench system, utilize the plan to construct the treatment field and assist with the installation of a new tank.

This two-day workshop will focus on the design and installation of an onsite wastewater system based on the flows from the facility being served and the in-situ soils ability to treat and disperse the effluent. Students will participate in a site and soil evaluation process and utilize the results from a to discuss the system design and apply it in the field. More information on the type of system being installed will be available once the Site and Soils Evaluation has taken place.

Download a registration form.